Facility Info
1437
SCG - Blythe
N/A
- N/A
- 33.60363
- -114.64365
- No
- 35
- 0
- 24
- 7
- 52
- N/A
- 486210
- 4922
- 719E/3271N
- No
- 10
Zone 3 - Blythe Area, round trip 8 hours, intrzone 0.5 hours (Riverside County)
- Yes
- 6
- 4
- C
- Active
- No
- No
- N/A
- Yes
- N/A
- No
- 12/31/1969
- 04/18/2023
Permit Number | Permit Description | Equipment Description | Issue Date | Expiration Date | Action | |
---|---|---|---|---|---|---|
C008092 | NON-SELECTIVE CATALYTIC REDUCTION DEVICE, | NON-SELECTIVE CATALYTIC REDUCTION DEVICE consist... | 10/07/2022 | 10/31/2023 |
Download Permit Print Permit |
|
B008079 | NATURAL GAS IC ENGINE, RECIPROCATING COMPRESSOR ... | Year of Manufacturer 2002. Engine Exhaust is ven... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
C008086 | OXIDATION CATALYST, | A Johnson Matthey-supplied high temperature (600... | 01/13/2025 | 10/31/2025 |
Download Permit Print Permit |
|
B008080 | NATURAL GAS IC ENGINE, RECIPROCATING COMPRESSOR ... | Year of Manufacturer 2002. Engine Exhaust is ven... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
C008087 | OXIDATION CATALYST, | A Johnson Matthey-supplied high temperature (600... | 01/13/2025 | 10/31/2025 |
Download Permit Print Permit |
|
T010103 | NATURAL GAS ODORANT STORAGE & INJECTION SYSTEM | A 10,000 gallon odorant tank and related equipme... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
E013097 | DIESEL IC ENGINE, EMERGENCY DIRECT-DRIVE WATER P... | Year of Manufacture is 2018. Engine is a certifi... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
B012852 | TURBINE, CENTRIFUGAL NATURAL GAS COMPRESSOR 1, P... | One Siemens-Dresser, Lean Pre-Mix Gas-fired Stat... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
B012853 | TURBINE, CENTRIFUGAL NATURAL GAS COMPRESSOR 2, P... | One Siemens-Dresser, natural gas-fired turbine, ... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
B012854 | TURBINE, CENTRIFUGAL NATURAL GAS COMPRESSOR 3, P... | One Siemens-Dresser, natural gas-fired turbine, ... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
B012855 | TURBINE, CENTRIFUGAL NATURAL GAS COMPRESSOR 4, P... | One Siemens-Dresser, Lean Pre-Mix Gas-fired Stat... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
C012856 | PLANT 4, TURBINE COMPRESSOR 1, OXIDATION CATALYS... | High temperature oxidation catalyst manufactured... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
C012857 | PLANT 4, TURBINE COMPRESSOR 2, OXIDATION CATALYS... | High temperature oxidation catalyst manufactured... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
C012858 | PLANT 4, TURBINE COMPRESSOR 3, OXIDATION CATALYS... | High temperature oxidation catalyst manufactured... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
C012859 | PLANT 4, TURBINE COMPRESSOR 4, OXIDATION CATALYS... | High temperature oxidation catalyst manufactured... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
C012860 | PLANT 4, TURBINE COMPRESSOR 1, SELECTIVE CATALYT... | a catalyst and ammonia injection system located ... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
C012861 | PLANT 4, TURBINE COMPRESSOR 2, SELECTIVE CATALYT... | a catalyst and ammonia injection system located ... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
C012862 | PLANT 4, TURBINE COMPRESSOR 3, SELECTIVE CATALYT... | a catalyst and ammonia injection system located ... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
C012863 | PLANT 4, TURBINE COMPRESSOR 4, SELECTIVE CATALYT... | a catalyst and ammonia injection system located ... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
B012865 | NATURAL GAS IC ENGINE, PRIME GENERATOR 2, PHASE ... | GE Power Waukesha with emPact Emission Control S... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
B012864 | NATURAL GAS IC ENGINE, PRIME GENERATOR 1, PHASE ... | GE Power Waukesha with emPact Emission Control S... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
B012866 | NATURAL GAS IC ENGINE, PRIME GENERATOR 3, PHASE ... | GE Power Waukesha with emPact Emission Control S... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
B012867 | NATURAL GAS IC ENGINE, PRIME GENERATOR 4, PHASE ... | GE Power Waukesha with emPact Emission Control S... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
B012868 | NATURAL GAS IC ENGINE, PRIME GENERATOR 5, PHASE ... | GE Power Waukesha with emPact Emission Control S... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |
|
C012870 | GENERATOR BUILDING, 3-WAY NSCR CATALYST, GENERAT... | EmPact Emission Control System located within th... | 10/16/2024 | 10/31/2025 |
Download Permit Print Permit |