Facility Info

3893
5E Boron Americas, LLC

27555 Hector Road
Newberry Springs, CA 92365
Phone: 442-292-2120
Fax: N/A
N/A

Permit Number Permit Description Equipment Description Issue Date Expiration Date Action
B013318 HCL INJECTION & RECOVERY A high pressure pump (250 psig) injecting an aqu... 03/23/2026 06/30/2026 Download Permit
Print Permit
B013319 PLS CLARIFIER A custom built system used to remove insoluble i... 03/23/2026 06/30/2026 Download Permit
Print Permit
B013320 SOLVENT EXTRACTION PROCESS A custom-built system using kerosene (diluent) a... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013321 BORIC ACID DRYER #1 A 3.5 MMBtu/hour natural gas fueled dryer manufa... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013322 BORIC ACID DRYER #2 A 3.5 MMBtu/hour natural gas fueled dryer manufa... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013323 BORIC ACID DRYER #3 A 3.5 MMBtu/hour natural gas fueled dryer manufa... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013325 BORIC ACID TRANSFER AND PRODUCT SIZING The Boric Acid (BA) being fed from the dryer is ... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013326 BORIC ACID TRUCK LOADING This custom built truck loadout system takes fin... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013327 BORIC ACID BAG PACKING This bagging system takes finished Boric Acid (B... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013333 SOP MANNHEIM FURNACE #1 A 20,000 Ton per Hour (Throughput to be verified... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013334 SOP MANNHEIM FURNACE #2 A 20,000 Ton per Hour (Throughput to be verified... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013335 SOP MANNHEIM FURNACE #3 A 20,000 Ton per Hour (Throughput to be verified... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013336 SOP MANNHEIM FURNACE #4 A 20,000 Ton per Hour (Throughput to be verified... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013328 COGENERATION BOILER #1 An Aryan model 45TPH/8MW natural gas fueled boil... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013329 COGENERATION BOILER #2 An Aryan model 45TPH/8MW natural gas fueled boil... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013330 COGENERATION BOILER #3 An Aryan model 45TPH/8MW natural gas fueled boil... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013337 SOP TRUCK LOADING This custom built truck loadout system takes fin... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013338 SOP BAG PACKING This bagging system takes finished SOP from the ... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013344 HCL ABSORPTION TOWER #1, SOP PROCESS A custom built HCL absorption tower used to diss... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013345 HCL ABSORPTION TOWER #2, SOP PROCESS A custom built HCL absorption tower used to diss... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013346 HCL ABSORPTION TOWER #3, SOP PROCESS A custom built HCL absorption tower used to diss... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013347 HCL ABSORPTION TOWER #4, SOP PROCESS A custom built HCL absorption tower used to diss... 06/12/2024 06/30/2025 Download Permit
Print Permit
B013331 GYPSUM MATERIAL TRANSFER, STORAGE, AND TRUCK LOA... Slightly damp gypsum cake exiting the pugmill i... 06/12/2024 06/30/2025 Download Permit
Print Permit
B014763 TEMPORARY UTILITY BOILER A Wyssmont model TBD natural gas fueled utility ... 06/12/2024 06/30/2025 Download Permit
Print Permit
B015249 MATERIAL HANDLING AND PACKAGING SYSTEM, BORIC AC... boric acid transfer and conveyance includes one ... 03/17/2026 06/30/2026 Download Permit